Maryland ADU
Contractors
Unit types

Detached, attached or basement ADU: which one fits your lot

The three kinds of ADU are not three prices for the same thing. In Maryland they land on different sides of the fire sprinkler rule, meet different permits, and cost very different money. The sprinkler line alone decides a lot of budgets.

Here is how they compare on the six things that matter, then the county pages where the cap is set.

The one line to know

Detached gets sprinklers, a conversion does not

A detached ADU is a new one family dwelling under the Maryland building code (COMAR 09.12.51.04, IRC R313.2) and gets an NFPA 13D sprinkler system in every county. An attached addition, a basement or a garage conversion inside a house that has no sprinklers is an addition or alteration, and the state code does not force a system on it. The only common exceptions are a county addition test and a house that already has sprinklers.

The full sprinkler rule, with the sources
Side by side

Six things that differ

Fire sprinklers

Detached
Yes, a full NFPA 13D system, in every Maryland county. The state building code treats the cottage as a new one family dwelling and the county cannot waive it.
Attached
No, if the house has no sprinklers and the addition stays under the county addition test (Howard and Anne Arundel use 50 percent of the house). A sprinklered house puts heads in the new space.
Basement
No, inside an unsprinklered house. It is an alteration under the state code.

Size cap

Detached
The state ceiling is 75 percent of the main house. Howard, Charles and the state law use that number; Anne Arundel caps at the lesser of 800 square feet or half the house.
Attached
Same cap, measured on the new space. An addition that is large against the house can trip the county sprinkler test before it trips the cap.
Basement
Rarely the limit. The basement is already inside the footprint; ceiling height and a way out decide it.

Permits

Detached
Zoning, a new residential construction building permit, a fire protection permit for the sprinklers, health review on a well or septic lot, then utility taps or a new service.
Attached
Zoning, an addition permit, health review on a well or septic lot, and electric or plumbing permits for the new fixtures.
Basement
Zoning, an alteration permit, egress and ceiling height at inspection, plumbing and electric for the kitchen and bath.

Published cost

Detached
$120,000 to $300,000 and up on the Maryland range, plus the sprinkler line at about $1.35 to $1.60 per square foot on public water, more on a well.
Attached
$100,000 to $250,000 on the same range. No sprinkler line in an unsprinklered house.
Basement
$80,000 to $200,000 on the same range. A garage conversion is listed at $75,000 to $150,000.

Privacy and use

Detached
Its own front door, its own yard line, no shared wall. The one that works best as a rental or for a parent who wants a real separate home.
Attached
Shares a wall and usually the water and sewer line. Close enough for care, separate enough for a kitchen of its own.
Basement
Under the same roof. Light, noise and a second exit are the questions, and a walkout grade solves most of them.

Utilities

Detached
A tap off the house line or a new service, sized for sprinkler flow. On a well, a storage tank and booster pump at the unit. A sub panel or a second meter for electric.
Attached
Usually extends the house water, sewer and electric. A sub panel if the house panel is full.
Basement
Extends the house systems. An ejector pump if the drain sits below the sewer line.

Where the ranges come from:

ADU cost in Maryland
Picking one

Three questions that usually settle it

  1. 1

    Who lives in it and for how long?

    A parent for the next ten years and a tenant for the next twenty want a detached unit. An adult kid for three years is a basement.

  2. 2

    Is the lot on a well?

    A well adds the health review and a sprinkler tank and pump to a detached unit. On a well lot a basement or attached unit skips both.

  3. 3

    How big is the house?

    The cap is a share of the main house. A small house with a big yard still gets a small cottage; an attached suite on a small house trips the addition test sooner.

The permits each type meets, in order:

ADU permit checklist
Get matched

A builder who has done all three

Send the address and which type you are leaning toward, or say you are not sure. We check the county rule and the sprinkler question, then connect you with a licensed Maryland builder who already does ADUs there.

14 builders on the list, seven counties, one person reads every form the same day.

Call (240) 261-0261